I have my final assessment interview booked in with CASA this coming Thursday. I'd love to chat with anyone that has gone through this process... it seems pretty daunting.
I've had my RePL license for about 6 months now and flown many jobs for clients and quite confident in my general knowledge but any help or advice would be greatly appreciated.
One element I have to complete before the phone call involves preparing (as quoted from CASA when advising of the date / time of this call...) a Job Safety Assessment, Risk Control Worksheet, Flight Authorisation, Pre-Operational Briefing for a task based scenario, this would be similar to one that would typically be undertaken by your proposed operation, this would include any pictorials, risk assessment, flight plans required, etc.
Scenario: Media Shoot – Opera House, NSW
You have been engaged to capture video imagery of an anti-nuclear protest at the Sydney Opera House. The protest is being held to coincide with the arrival of a foreign nuclear submarine into Sydney Harbour.
The client wants video of the protest including close-ups and wider shots which show the scale of the event.
Complete a JSA / job plan for the shoot including details of how you would go about obtaining the necessary permissions.
As a minimum that must include:
I've had my RePL license for about 6 months now and flown many jobs for clients and quite confident in my general knowledge but any help or advice would be greatly appreciated.
One element I have to complete before the phone call involves preparing (as quoted from CASA when advising of the date / time of this call...) a Job Safety Assessment, Risk Control Worksheet, Flight Authorisation, Pre-Operational Briefing for a task based scenario, this would be similar to one that would typically be undertaken by your proposed operation, this would include any pictorials, risk assessment, flight plans required, etc.
Scenario: Media Shoot – Opera House, NSW
You have been engaged to capture video imagery of an anti-nuclear protest at the Sydney Opera House. The protest is being held to coincide with the arrival of a foreign nuclear submarine into Sydney Harbour.
The client wants video of the protest including close-ups and wider shots which show the scale of the event.
Complete a JSA / job plan for the shoot including details of how you would go about obtaining the necessary permissions.
As a minimum that must include:
- Conducting a preliminary JSA;
- Identification of any risks which are not dealt with by your normal operating procedures;
- Development of risk management strategies to mitigate all non-standard risks down to an acceptable level;
- Identify any factors which may affect when and how you complete the task.